The work continues in the baby's room. There was no insulation in the room, but we were told this was a good thing since insulation from when the house was built would have basically been shredded paper which means it would have been a huge mess to remove & clean up. 

So, Chris put in some insulation. 


And then he started to finish installing the drywall on that half of the room & the closet. 


And now he's doing the taping and plastering. 


Still on the to-do list:
-sanding
-paint
-trim
-finish built-in shelving
-install new heater 
-install ceiling fan
-finish floors
-move-in furniture & decorate!

I am DYING to get in there and decorate. It's hard for me to have all of the baby stuff pile up in other areas of the house. Some days it really drives me crazy and I end up reorganizing the bags of blankets, clothes, toys, etc. 
And it's nearly impossible to keep the house clean while all of this work is going on. But, it will be over soon and it will all be worth it in the end. 

No comments:

Post a Comment